Joe’s Picks

Joe’s Podcast Setup

All of Joe’s Picks
Joe’s FIBERS podcast studio: cameras, mics, lights and the switcher desk
The FIBERS™ studio, where every episode is recorded.
Attic → Studio

The Transformation


It started as an attic packed with overflow materials from hundreds of flips. In December 2025, Joe started clearing it out, and then the renovation began. Here’s how that attic became the FIBERS™ studio.

01Open rafters to recording day

During: open rafters, before the insulation and ceiling went inDuring
After: Recording day: cameras, lights and a guest at the tableAfter

02Insulation to kitchenette

During: spray-foam insulation going in around the windowDuring
After: Same window, now the studio kitchenetteAfter

03Bare attic to recording set

During: the bare attic, open rafters, looking down the room toward the windowDuring
After: The window wall today: the recording set, lit for an episodeAfter

04Empty room to lounge

During: the empty room, painted, before flooringDuring
After: The finished lounge, mid-conversationAfter

More photos coming

More shots from the cleanout and the build will be added here.

The build, step by step

  1. Step 1: Cleared out, framing and wiring going in
    1Cleared out, framing and wiring going in
  2. Step 2: Wiring run through the new wall framing
    2Wiring run through the new wall framing
  3. Step 3: Framed doorways, insulation in the knee walls
    3Framed doorways, insulation in the knee walls
  4. Step 4: Open rafters, before insulation
    4Open rafters, before insulation
  5. Step 5: Spray-foam insulation
    5Spray-foam insulation
  6. Step 6: Framing the walls
    6Framing the walls
  7. Step 7: Foam on the whole roofline, looking toward the window
    7Foam on the whole roofline, looking toward the window
  8. Step 8: Materials in by crane
    8Materials in by crane
  9. Step 9: Hanging the ceiling drywall
    9Hanging the ceiling drywall
  10. Step 10: Walls and ceiling drywalled
    10Walls and ceiling drywalled
  11. Step 11: Painted, ready for floors
    11Painted, ready for floors
  12. Step 12: Laying the floor
    12Laying the floor
  13. Step 13: Kitchenette cabinets
    13Kitchenette cabinets
  14. Step 14: Slat walls, finished
    14Slat walls, finished

On video

A walk around the attic during framing
The drywall crew at work
Gear list coming soon

Every camera, mic and light in this room, with a link to each, is on its way.

Some links on these pages are affiliate links; I may earn a commission at no extra cost to you.

All of Joe’s Picks